Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Arias, S (2014) Engineer manual 385 effectiveness: A study of predictive analytics, Unpublished PhD Thesis, , Indiana State University.

Bradford, C W (2017) The impact of the systematic incorporation of tolerances on gypsum board installation, Unpublished PhD Thesis, , Indiana State University.

Bruce, R D (2008) A study of craft worker length of employment at select Missouri construction companies, Unpublished PhD Thesis, , Indiana State University.

Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes, Unpublished PhD Thesis, , Indiana State University.

Chukwu, I (2018) Sustainability in the Nigerian construction industry: The feasibility of adopting green building rating system, Unpublished PhD Thesis, , Indiana State University.

Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules, Unpublished PhD Thesis, , Indiana State University.

  • Type: Thesis
  • Keywords: accuracy; scheduling; teaching
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305337138
  • Abstract:
    The purpose of this experimental study was to compare the time and accuracy of evaluating a project schedule under two conditions; using currently-available outputs provided by scheduling software programs and using output modifications that were developed during this investigation. Thus, the study focused on the following five research objectives: (1) Substantiate that schedules developed using software features identified in the literature review are difficult and time-consuming to assess by users. (2) Determine what currently-available outputs are used to assess schedules using the software features. (3) Determine how currently-available outputs can be modified to improve the analysis of project schedules using the software features. (4) Develop an output modification to improve the accuracy and efficiency of assessing project schedules. (5) Validate the output modification by means of experimentation. The results of this research indicate that utilization of modified PDM schedule outputs could decrease assessment time and increase accuracy. Recommendations are given that may provide benefits to the teaching and practice of scheduling.

Fee, S T (2005) Sustainable construction practices: Contractors' perceptions of awareness and participation, Unpublished PhD Thesis, , Indiana State University.

Graham, G (2016) Factors influencing and risk associated with the use of drones by specialty construction companies in the United States of America, Unpublished PhD Thesis, , Indiana State University.

Gravitt, D D (2004) The development and validation of a bar code based residential construction quality inspection procedure, Unpublished PhD Thesis, , Indiana State University.

Haddad, B (2007) Risk management in the contractual language in the construction industry: The effect of exculpatory clauses on contractor bid price, Unpublished PhD Thesis, , Indiana State University.

Kamm, J D (2017) A study of technological change in the construction industry through understanding the importance of innovation, risk and stakeholder alignment in construction lending, Unpublished PhD Thesis, , Indiana State University.

Mutai, A (2009) Factors influencing the use of building information modeling (BIM) within leading construction firms in the United States of America, Unpublished PhD Thesis, , Indiana State University.

Ohrn, G (2009) The influence of job-order-contracting as a construction project delivery method on owner satisfaction, Unpublished PhD Thesis, , Indiana State University.

Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects, Unpublished PhD Thesis, , Indiana State University.

Onsarigo, L M (2016) Cost comparison of horizontal auger boring and open-cut construction methods for culvert installations, Unpublished PhD Thesis, , Indiana State University.

Patton, J R (2013) Task diminishment: Construction value loss due to sub-optimal task execution, Unpublished PhD Thesis, , Indiana State University.

Rich, F A (2020) Managing the wear of heavy construction equipment steel track undercarriage by soil sand content, Unpublished PhD Thesis, , Indiana State University.

Sauer, A D (2013) Sustainable building codes: How the perceptions of building code officials influence their intent to adopt the international green construction code, Unpublished PhD Thesis, , Indiana State University.